order Now

Gantt Chart

Assignment is four parts. Please label each part of the assignment Part 1, Part 2, Part 3, and Part 4 in the document, and insert a page break after each part. Please submit as one document.

Assignment requires the use of MS Project or similar software.

Part 1: Develop an in-depth schedule for your initial project based on the Work Breakdown Structure. Please refer to the Integrated Project. Include:

1. An activity precedence diagram 2. An activity duration table 3. A network diagram and Gantt charts

Part 2: Please complete Case Study 10.2, “Project Scheduling at Blanque Check Construction” respond to the questions for discussion. Please make sure that each question is answered thoroughly; minimum of 200 words for each case study question.

Part 3: Develop the network activity chart and identify the critical path for a project based on the information provided in the Gantt Chart Activity document.

1. Draw the activity network as a Gantt chart. 2. What is the expected duration of the project?

Part 4: Consider the project with the information provided in the Project Activity Network document.

1. Construct the project activity network using AON methodology and label each node. 2. Identify the critical path and other paths through the network.

We are always aiming to provide top quality academic writing services that will surely enable you achieve your desired academic grades. Our support is round the clock!

[order_calculator]